Traffic Advice
Temporary Traffic Arrangements on Tung Chung Waterfront Road
Motorists are advised that in order to facilitate tunnel lighting maintenance works, the following temporary traffic arrangements will be implemented from 10.00 a.m. to 4.00 p.m. daily on 3 and 4 July 2025:-
i. Lane Closure
- A section of the right lane of Tung Chung Waterfront Road eastbound from its junction with its slip road heading to North Lantau Highway eastbound to a point about 75 meters west of the same junction; and a section of traffic lane of the slip road of Tung Chung Waterfront Road heading to North Lantau Highway eastbound from its junction with Tung Chung Waterfront Road to a point about 120 meters south of the same junction, will be temporarily closed to all vehicular traffic.
- During the lane closure, motorists could still make access to the remaining traffic lanes.
ii. Traffic Diversion
- Affected vehicles on Tung Chung Waterfront Road eastbound heading to North Lantau Highway eastbound will be diverted via Tung Chung Development Pier, Tung Chung Waterfront Road westbound and the slip road heading to North Lantau Highway eastbound.
Appropriate traffic signs and road markings will be erected on site to guide motorists. Motorists are advised to drive with utmost care and patience.