Members of the public are advised that in order to facilitate drainage works, the following temporary traffic and transport arrangements will be implemented on Sha Tau Kok Road – Wo Hang from 8.00 am on 16 June 2025 to 7.00 pm on 4 April 2026:
(1) LANE CONVERSION
A section of Sha Tau Kok Road – Wo Hang from a point about 104 metres east of its junction with the unnamed access road leading to Shek Kiu Tau Tsuen to a point about 134 metres east of the same junction will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic.
(2) PUBLIC TRANSPORT SERVICE ARRANGEMENTS
The bus stop on Sha Tau Kok Road – Wo Hang southbound near Yim Tso Ha will be temporarily relocated. Details are as follows:
|
Routes Nos. |
Direction |
Temporary Arrangement |
|
KMB Route Nos. 78, 78K, 78S, 277A and N78 |
Sheung Shui / Kowloon bound |
Relocated about 15 metres northwards |
Appropriate traffic signs will be erected on site to guide motorists. The bus company will display notices to advise passengers of the above temporary arrangement.