Members of public are advised that to facilitate water works, Long Yat Road northbound, from its junction with Long Lok Road to a point about 50 meters north of the same junction will continue be temporarily closed to all vehicular traffic. The right turn lane at Long Yat Road southbound to Long Lok Road will continue to be converted from one-lane-one-way traffic into one-lane-two-way traffic from 6.00 p.m. on 6 July 2025 to 6.00 p.m. on 30 September 2025.
Appropriate traffic signs will be erected to guide motorists.