Members of the public are advised that, to facilitate the Kwu Tung North New Development Area works, the following temporary traffic arrangements will continue to be implemented from 6.00 pm on 27 June 2025 to 6.00 pm on 31 December 2025:
Traffic Diversion
1. Motorists on Kwu Tung Road (both bounds) or Fanling Highway westbound via flyover northbound near Pak Shek Au connecting Castle Peak Road – Chau Tau with Kwu Tung Road heading for Castle Peak Road – Chau Tau (both bounds) will be diverted via temporary road; and
2. Motorists on Castle Peak Road – Chau Tau (both bounds) or Fanling Highway westbound via flyover southbound near Pak Shek Au connecting Castle Peak Road – Chau Tau with Kwu Tung Road heading for Kwu Tung Road (both bounds) will be diverted via temporary road.
Appropriate traffic signs and road markings have been erected on site to guide the motorists. Motorists are advised to follow the instructions on site and drive with utmost care.