Members of the public are advised that to facilitate drainage works, a section of Sau Ming Road near Sau Nga House, Sau Mau Ping Estate will be temporarily converted from two-lane-two-way traffic into one-lane-two-way traffic from 11.00 pm to 6.00 am next day daily during the period from 2 July 2025 to 2 August 2025.
The existing GMB stop for Kowloon GMB Route No. 91 on Sau Ming Road southbound outside Sau Nga House, Sau Mau Ping Estate will be temporarily relocated for about 60 metres southward
Appropriate traffic signs will be erected on site to guide motorists. Public transport operator will put up notice to advise passengers of the above arrangements.