TRAFFIC ADVICE
Temporary Traffic and Transport Arrangements on Mansfield Road, The Peak

        Members of the public are advised that to facilitate drainage works, the following temporary traffic and transport arrangements will be implemented on Mansfield Road from 8.00 am on 10 July 2025 to 6.00 pm on 31 July 2025:

A.     Traffic Arrangement

The section of Mansfield Road near Rosmead Road will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic.

B.     Suspension of Bus Stop

The bus stop of CTB Route No. 15 at No. 2 Mansfield Road will be temporarily suspended.

        Appropriate traffic signs will be provided on-site to guide motorists. The bus company will display notices at the affected stop to advise passengers of the above arrangements.