Motorists are advised that, to facilitate drainage works, the section of Ping Che Road from a point about 30 metres north of its junction with Ping Yuen Road to a point about 60 metres north of the same junction will be temporarily converted to one-lane two-way traffic from 10 a.m. on 14 July 2025 (Monday) to 7 p.m. on 13 January 2026 (Tuesday).
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.