TRAFFIC ADVICE
Temporary Traffic Arrangement on Tin Wan Praya Road, Southern District

        Motorists are advised that to facilitate drainage works, the section of Tin Wan Praya Road outside Aberdeen Preliminary Treatment Works will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic from 10.00 am on 9 July 2025 to 6.00 pm on 3 September 2025.

        Appropriate traffic signs will be provided on-site to guide motorists.