Traffic Advice
Temporary Traffic Arrangements on Chung Nga Road, Tai Po

        Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented at Chung Nga Road from 8.00 am on 25 August 2025 to 6.00 pm on 31 December 2025.

(I)    Lane Conversion

The section of Chung Nga Road from a point about 190 metres west of its northern junction with Chuen On Road to a point about 80 metres west of the same junction will be converted from two-lane two-way traffic into one-lane two-way traffic.

The section of the unnamed access road leading to Hong Chi Pinehill Village from its junction with Chung Nga Road to a point about 30 metres north of the same junction will be converted from two-lane two-way traffic into one-lane two-way traffic.

(II)   Relocation of Motorcycle Parking Spaces

8 nos. of motorcycle parking spaces at the layby at Chung Nga Road near Hong Kong Red Swastika Society Tai Po Secondary School will be relocated 40 metres west to the same layby.

        Appropriate traffic signs will be erected on-site to guide motorists.