Members of the public are advised that, to facilitate road works, the following temporary traffic and transport arrangements will continue to be implemented from 6.00 p.m. on 27 August 2025 to 6.00 p.m. on 26 February 2026.
(I) Lane Closure
Part of the traffic lanes of Shan Ha Road (southbound) near its junction with Lam Yu Road will be temporarily closed to all vehicular traffic.
(II) Relocation of GMB Stop
The GMB stop for N.T. GMB Route No. 604 at Shan Ha Road (southbound) near Lam Yu Road will be temporarily relocated about 20 meters northward.
Appropriate traffic signs have been erected on site to guide motorists. The GMB operator has displayed notices at the GMB stop concerned to notify passengers of the above temporary arrangement.