Members of public are advised that, to facilitate water works, the traffic lane of Long Yat Road (northbound) from its junction with Long Lok Road to a point about 50 meters north of the same junction will continue to be temporarily closed to all vehicular traffic. The right turn lane of Long Yat Road (southbound) to Long Lok Road will continue to be converted from one-lane-one-way traffic into one-lane-two-way traffic from 6.00 p.m. on 30 September 2025 to 6.00 p.m. on 31 December 2025.
Appropriate traffic signs have been erected to guide motorists.