Members of the public are advised that to facilitate lift construction works, the slow lane of Jockey Club Road northbound from its junction with Fu Hing Street to a point about 40 metres south of the same junction will be temporarily closed to all vehicular traffic from 12 a.m. on 6 October 2025 (Monday) to 11 p.m. on 5 April 2026 (Sunday).
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive in utmost care.