Members of the public are advised that, to facilitate the construction works for the Development of Lok Ma Chau Loop, the following temporary traffic and transport arrangements will be implemented from 1.00 a.m. to 5.30 a.m. on 26 October 2025:
(a) Road Closure
The slip road leading from San Tin Interchange to Fanling Highway eastbound will be closed to all vehicular traffic.
(b) Traffic Diversion
Motorists on San Tin Interchange heading for Fanling Highway eastbound will be diverted via Castle Peak Road - Chau Tau eastbound and the unnamed road southbound near Pak Shek Au.
(c) Public Transport Arrangements
KMB Route No. N73 (Sha Tin bound), LWB Route No. NA43 (Sheung Shui bound) and GMB Route No. 616S (Mong Kok bound) will be diverted via Castle Peak Road – San Tin eastbound, Castle Peak Road - Chau Tau eastbound and the unnamed road southbound near Pak Shek Au, before resuming their original routeings.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care. The public transport operators will display notices to advise passengers of the above temporary service arrangements.