Traffic Advice
Temporary Traffic Arrangements on Kwai Foo Road and Kwai Yan Road, Kwai Chung
Motorists are advised that to facilitate drainage works, the following temporary traffic arrangements will be implemented on Kwai Foo Road and Kwai Yan Road, Kwai Chung, from 1.00 am to 5.30 am on Mondays to Saturdays (except Public Holidays) from 30 October 2025 to 28 February 2026:
(I) Lane Closure
The following lanes will be temporarily closed to all vehicular traffic:
- The fast lane of Kwai Foo Road eastbound from its junction with Kwai Yan Road to a point about 75 metres west of the same junction;
- The middle lane of Kwai Foo Road westbound from a point about 17 metres east of its junction with Kwai Yan Road to a point about 40 metres east of the same junction;
- The middle lane of Kwai Foo Road westbound from a point about 9 metres east of its junction with Kwai Yan Road to a point about 23 metres west of the same junction;
- The slow lane of Kwai Foo Road westbound from a point about 7 metres west of its junction with Kwai Yan Road to a point about 23 metres west of the same junction; and
- The slow and middle lanes of Kwai Yan Road southbound from its junction with Kwai Foo Road to a point about 35 metres south of the same junction.
(II) Banning of Turning Movement
- All vehicles will be prohibited from making right turn from Kwai Foo Road eastbound to Kwai Yan Road southbound.
(III) Traffic Diversion
- Affected vehicles on Kwai Foo Road eastbound heading for Kwai Yan Road southbound will be diverted via Kwai Foo Road eastbound, Kwai Chung Road northbound, Kwai Yik Road westbound, Hing Fong Road southbound, Kwai Fuk Road eastbound, Kwai Yi Road northbound, Kwai Foo Road westbound and Kwai Yan Road southbound.
Motorists are advised to drive with upmost care and patience. Appropriate traffic signs will be erected on site to guide motorists.