TRAFFIC ADVICE
Extension of Temporary Traffic and Transport Arrangements on Cha Kwo Ling Road, Kwun Tong


       Motorists are advised that to facilitate underground utilities works, the following temporary traffic and transport arrangements will continue to be implemented from 11.45 pm on 31 October 2025 to 11.45 pm on 30 November 2025.

   (1) Lane Closure

The following lanes will be temporarily closed to all vehicular traffic:

  1. The fast lane of Cha Kwo Ling Road westbound of about 160 metres near Cha Kwo Ling Salt Water Pumping Station; and
  2. The fast lane of Cha Kwo Ling Road eastbound of about 160 metres near Cha Kwo Ling Salt Water Pumping Station.
   (2) Public Transport Arrangements

The GMB stops on Cha Kwo Ling Road westbound near Wing Shan Industrial Building for Kowloon GMB Route Nos. 23C (Lam Tin bound) and 90A (Hong Kong Children's Hospital bound) will be temporarily relocated about 55 metres eastward.

        Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to observe the instruction and drive with utmost care. Notices will also be displayed by public transport operators to advise passengers of the above arrangements.