Traffic Advice
Temporary Traffic Arrangement on Pik Fung Road, Fanling


          Members of the public are advised that in order to facilitate lifting works, a section of Pik Fung Road from a point about 70 metres west of its junction with Jockey Club Road to a point about 35 metres west of the same junction will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic from 8.00 am to 4.00 pm on every Sunday between 23 November 2025 and 28 December 2025.

          Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.