Transport Department Notice
Extension of Temporary Traffic Arrangements on Kam Tai Road, Yuen Long


        Notice is hereby given that to facilitate road works, the following temporary traffic arrangements will continue to be implemented on Kam Tai Road from 6.00 p.m. on 30 November 2025 to 6.00 p.m. on 28 February 2026.

(I)    Road Closure

        The section of Kam Tai Road northbound from a point about 75 metres north of its western junction with Kam Tin Road to a point about 220 metres north of the same junction will be temporarily closed to all vehicular traffic.

(II)   Lane Conversion

(i)     The section of Kam Tai Road northbound from its western junction with Kam Tin Road to a point about 75 metres north of the same junction will be temporarily converted from one-lane one-way traffic into one-lane two-way traffic; and
(ii)    The section of Kam Tai Road eastbound from its junction with Kam Hing Road to a point about 280 metres west of the same junction will be temporarily converted from one-lane one-way traffic into one-lane two-way traffic.

(III)   Traffic Diversion

        Affected vehicles on Kam Tin Road eastbound heading for Kam Tai Road northbound will be diverted via roundabout linking Kam Tin Bypass, Kam Tin Bypass eastbound, Kam Hing Road northbound and Kam Tai Road westbound.

        Appropriate traffic signs have been erected to guide motorists.

KWOK Wai-ying, Candy Commissioner for Transport (Acting)