Members of the public are advised that, to facilitate the construction works for the Development of Lok Ma Chau Loop, the following temporary traffic arrangements will be implemented daily from 12 midnight to 5.30 am on any 8 nights (except Saturdays, Sundays and Public Holidays) between 28 November 2025 and 31 January 2026:
(a) Road Closure
The elevated slip road connecting Lok Ma Chau Road southbound and San Tin Interchange will be temporarily closed to all vehicular traffic.
(b) Traffic Diversion
Motorists on Lok Ma Chau Road southbound heading for San Tin Interchange will be diverted via Castle Peak Road – San Tin westbound.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.