Motorists are advised that, to facilitate the construction works for the Development of Lok Ma Chau Loop, 9 metered parking spaces (no. 24501A, 24501B, 24502A, 24502B, 24503A, 20504A, 24504B, 20505A and 24505B) at Lok Ma Chau Road near Lok Ma Chau Path, Yuen Long will continue to be temporarily suspended from 4.00 pm on 30 November 2025 to 4.00 pm on 28 February 2026.
Appropriate traffic signs have been erected on site to guide motorists.