Traffic Advice
Extension of Temporary Traffic and Transport Arrangements on
Sheung Fung Street, Wong Tai Sin

      Members of the public are advised that to facilitate water main laying works, the following temporary traffic and transport arrangements will continue to be implemented on Sheung Fung Street northbound from 7.00 pm on 30 November 2025 to 7.00 pm on 31 January 2026: -

  1. Lane Closure

Part of the slow lane of Sheung Fung Street northbound near Wu York Yu Health Centre will continue to be temporarily closed to all vehicular traffic.

   2. Public Transport Arrangements

  1. The bus stop for KMB route no. 15A on Sheung Fung Street northbound near Wu York Yu Health Centre will continue to be temporarily relocated about 35 metres northwards; and

  2. The GMB stop for Kowloon GMB route nos. 37A and 37M on Sheung Fung Street northbound near Wu York Yu Health Centre will continue to be temporarily relocated about 35 metres northwards.

        Appropriate traffic signs and road markings have been erected on site to guide motorists. The public transport operators will display notices to advise passengers of the above temporary arrangements.