TRAFFIC ADVICE
Extension of Temporary Traffic Arrangements on Cha Kwo Ling Road, Kwun Tong


       Motorists are advised that to facilitate underground utilities works, the following traffic lanes will continue to be closed to all vehicular traffic from 11.45 pm on 30 November 2025 to 11.45 pm on 31 December 2025:

    1. The fast lane of Cha Kwo Ling Road westbound of about 110 metres near Cha Kwo Ling Salt Water Pumping Station; and
    2. The fast lane of Cha Kwo Ling Road eastbound of about 110 metres near Cha Kwo Ling Salt Water Pumping Station.

       Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to observe the instruction and drive with utmost care.