Traffic Advice
Temporary Traffic Arrangements on Ng Chow South Road, North District


Motorists are advised that, to facilitate road works, the following temporary traffic arrangements will be implemented on Ng Chow South Road from 9 a.m. to 6 p.m. on 14 December 2025 (Sunday):

(I) Traffic Arrangements

  1. The section of Ng Chow South Road between Ng Chow Road and Ping Che Road will be converted from two-lane two-way traffic into one-lane one-way traffic eastbound. The above section will be temporarily closed for all vehicular traffic from Ng Chow South Road (westbound) and Ng Chow Road (southbound);

  1. The section of Ping Che Road from a point about 30 metres south of its junction with Ng Chow South Road to a point about 35 metres north of the same junction will be converted from two-lane two-way traffic into one-lane two-way traffic.

(II) Traffic Diversion

Vehicles on Ng Chow South Road (westbound) and Ng Chow Road (southbound) heading for Ping Che Road will be diverted via Ng Chow Road (southbound).

Appropriate traffic signs and road markings will be provided on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.