Members of the public are advised that to facilitate tree felling works, the slow lane of Fanling Highway (eastbound) from a point about 700 meters west of its junction with Tai Tau Leng roundabout (near exit 9) to a point about 220 meters west of the same junction will be temporarily closed to all vehicular traffic from 12 a.m. to 5 a.m. on 19 December 2025 (Friday) and 30 December 2025 (Tuesday).
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.