TRAFFIC ADVICE
Extension of Temporary Relocation of Metered Parking Spaces in Wing Kwong Street, To Kwa Wan


           Motorists are advised that to facilitate works, four metered parking spaces (nos. 7959AB and 7960AB) in Wing Kwong Street will continue to be temporarily relocated to Yuk Shing Street with effect from 6.00 pm on 9 December 2025 to 6.00 pm on 28 February 2026.

           Appropriate road markings have been erected on site to guide motorists.