Traffic Advice
Temporary Traffic and Transport Arrangements on Hung Tin Road, Yuen Long


        Members of the public are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Hung Tin Road from 0.01 a.m. to 5.00 a.m. daily on 9, 11, 13 and 16 December 2025:

(A)   Temporary Traffic Arrangements

(I)     Road Closure

        The slip road leading from Hung Tin Road southbound to Yuen Long Highway westbound will be temporarily closed to all vehicular traffic.

(II)   Traffic Diversion

        Affected vehicles on Hung Tin Road southbound heading for Yuen Long Highway westbound will be diverted via Yuen Long Highway eastbound, Long Tin Road northbound, Shui Pin Wai Interchange, Long Tin Road southbound and Tong Yan San Tsuen Interchange.

(B)   Temporary Transport Arrangement

        LWB Route Nos. N30 (Airport bound) and E36A (Tung Chung bound) will be diverted via Castle Peak Road – Hung Shui Kiu westbound, Castle Peak Road – Lam Tei southbound, Lam Tei Interchange and Tuen Mun Road southbound before resuming to their original routeings.

        Appropriate traffic signs will be erected to guide motorists. The bus company will put up notices to advise passengers of the above arrangement.