Traffic Advice
Temporary Traffic Arrangements on Tolo Highway and Tate's Cairn Highway, Shatin
Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented from 00:30 a.m. to 05:30 a.m. on 23 December 2025:
-
-
The leftmost lane of Tate's Cairn Highway (northbound) from a point about 175 meters south of its junction with Tolo Highway (northbound) to a point of the same junction will be temporarily closed to all vehicular traffic;
-
- The leftmost lane of Tolo Highway (northbound) from its junction with Tate's Cairn Highway (northbound) to a point about 390 meters north of the same junction will be temporarily closed to all vehicular traffic; and,
-
-
The leftmost lane of Tolo Highway (northbound) from a point about 410 meters north of its junction with Tate's Cairn Highway (northbound) to a point about 640 meters north of the same junction will be temporarily closed to all vehicular traffic.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive in utmost care.