Motorists are advised that to facilitate road resurfacing works, the following temporary traffic arrangements will be implemented in Yau Tong from 10.00 pm on 12 December 2025 to 6.00 am on 13 December 2025.
The fast lane of Cha Kwo Ling Road northbound from its junction with Ko Chiu Road to a point about 170 metres south of the same junction will be temporarily closed to all vehicular traffic.
Vehicles will be temporarily prohibited from making right turn from Sze Shan Street eastbound onto Cha Kwo Ling Road southbound.
(3) Traffic Diversion
Affected vehicles on Sze Shan Street eastbound heading for Cha Kwo Ling Road southbound will be diverted via Cha Kwo Ling Road northbound, Ko Chiu Road eastbound, Lei Yue Mun Road roundabout and Yan Wing Street southbound.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to observe the instruction and drive with utmost care.