Motorists are advised that to facilitate works, one-lane two-way traffic arrangement will be temporarily implemented at the section of Hang Kwong Street from a point about 110 metres west of its junction with Hang Hong Street to a point about 150 meters west of the same junction, from 10.00 am to 3.00 pm daily on 20,22,23,29 and 30 December 2025.
Appropriate traffic signs will be erected on site to guide motorists.