Traffic Advice

Extension of Temporary Traffic Arrangements on Man Kam To Road
,
North District


Motorists are advised that, to facilitate sewerage works, the slow lane of Man Kam To Road northbound from a point about 30m south of its junction with Sha Ling Road to a point about 120 meters south of the same junction will continue to be temporarily closed to all vehicular traffic from 7 p.m. on 17 December 2025 (Wednesday) to 7 p.m. on 9 February 2026 (Monday) and from 10 a.m. on 24 February 2026 (Tuesday) to 7 p.m. on 17 March 2026 (Tuesday).

Appropriate traffic signs will continue to be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.