Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented on Wan Po Road and Tseung Kwan O Tunnel Road in the following days:
|
Date |
Time |
Traffic Arrangement |
| 6 January 2026 | From 10.00 pm to 5.00 am of the following day |
|
| 7 January 2026 | From 10.00 pm to 5.00 am of the following day |
|
| 13 and 14 January 2026 | From 10.00 pm to 5.00 am of the following day daily |
|
Motorists are advised to drive with care and patience. Appropriate traffic signs will be erected on site to guide motorists.