Traffic Advice

Temporary Traffic Arrangements
on Kwok Shui Road, Tsuen Wan

        Motorists are advised that to facilitate drainage works, the following temporary traffic arrangements will be implemented on Kwok Shui Road from 1.00 a.m. to 6.00 a.m. daily on every Mondays to Saturdays from 2 January to 30 January 2026 :

Road Closure

The slow lane of Kwok Shui Road eastbound from a point about 30 meters west of its junction with Cheung Wing Road northbound to a point about 80 meters west of the same junction will be temporarily closed to all vehicular traffic; and

The third and fourth lanes of Kwok Shui Road eastbound from its junction with Cheung Wing Road southbound to a point about 80 meters west of the same junction will be temporarily closed to all vehicular traffic.

Traffic Diversion

Affected vehicles on the cul-de-sac of Kwok Shui Road (near 45-51 Kwok Shui Road) heading for Cheung Wing Road northbound will be diverted via Cheung Wing Road southbound and Castle Peak Road – Kwai Chung westbound.

Appropriate traffic signs will be erected on site to guide motorists.