Traffic Advice
Temporary Traffic and Transport Arrangements on Tai Mong Tsai Road and Sai Kung Man Yee Road, Sai Kung

       Motorists are advised that to facilitate the holding of the China Coast Marathon & Half Marathon and the Community Chest Sun Hung Kai Properties Corporate Challenge 2026, the following temporary traffic and transport arrangements will be implemented:

A. Road Closure

(i) The section of Tai Mong Tsai Road between Pak Tam Chung Physically Handicapped and Able-bodied Site and Sai Kung Man Yee Road will be intermittently closed from 7.25 am to 7.35 am and from 7.55 am to 8.05 am on 11 January 2026; and

(ii) The section of Sai Kung Man Yee Road from its junction with Tai Mong Tsai Road to a point about 8.3 kilometres south of the same junction will be temporarily closed from 7.30 am to 1.30 pm on 11 January 2026.

B. Public Transport Arrangement

During the road closure period of Sai Kung Man Yee Road, the service of New Territories Green Minibus Route No. 9A (Pak Tam Chung – High Island Reservoir, East Dam) will be suspended from 9.30 am to 1.30 pm, and taxis will be prohibited to enter Sai Kung Man Yee Road, until the reopening of the road.

       Appropriate traffic signs will be erected on site to guide motorists. Actual implementation of the road closure and traffic control will be made by the Police at the time depending on conditions in the areas.