Traffic Advice
Temporary Traffic Arrangements on King Sau Lane and King Fung Path, Tuen Mun
Motorists are advised that in order to facilitate road works, the following temporary traffic arrangements will be implemented on King Sau Lane and King Fung Path from 10.00 am to 4.00 pm daily from 12 to 17 January 2026:
- Lane Conversion
The section of King Fung Path from a point about 25 metres south of its junction with King Sau Lane to a point about 20 metres north of the same junction will be temporarily converted into one-lane two-way traffic.
- Suspension of Metered Parking Space
1 number of metered parking space (no. 22229B) on King Fung Path will be temporarily suspended.
Appropriate traffic signs will be erected on site to guide motorists.