Hong Kong Marathon 2026 – Road closures in New Territories
To facilitate the holding of the Hong Kong Marathon 2026 this Sunday (January 18), temporary road closures will be implemented at various locations in phases from Saturday (January 17) at 11.30pm and they will be reopened subject to the race progress. It is anticipated all closed roads will be reopened by about 2pm on Sunday.
Since the full marathon will use the Kowloon-bound carriageways of Cheung Tsing Highway, Cheung Tsing Tunnel and Nam Wan Tunnel as the race route, vehicles on Lantau Link (Tsing Ma Bridge) heading to Kowloon will be diverted to use North West Tsing Yi Interchange, Tsing Yi North Coastal Road, Tsing Tsuen Road, Tsuen Wan Road, Kwai Chung Road, Cheung Sha Wan Road and Lai Chi Kok Road. It is anticipated that traffic congestion along North Lantau Highway, Tsing Ma Bridge and the vicinity of North West Tsing Yi Interchange may occur.
The above road closures will not affect vehicles from Hong Kong Island/Kowloon/New Territories East heading for Hong Kong International Airport and Lantau Island. Vehicles from the New Territories West to the Airport and Lantau Island could travel via Tuen Mun-Chek Lap Kok Tunnel. Due to the closure of the Kowloon-bound carriageway of Ting Kau Bridge, vehicles travelling via Tuen Mun Road or Tai Lam Tunnel to the Airport and Lantau Island will be diverted to use Tsuen Wan Road, Tsuen Tsing Interchange, Tsing Tsuen Road, Tsing Tsuen Bridge and Tsing Yi North Coastal Road to enter Tsing Ma Bridge.
The TD anticipates that the traffic at Lantau Link (Kowloon bound) and North West Tsing Yi Interchange will be more significantly congested when compared with normal Sundays.
Motorists are advised to avoid driving to the above affected areas. In case of traffic congestion, motorists should exercise patience and drive with care, and follow the instructions of the Police on-site.