Traffic Advice
Temporary Traffic Arrangements on Ma Sik Road and Ma Tak Road, Fanling
Members of the public are advised that to facilitate road works, the following temporary traffic arrangements will be implemented on Ma Sik Road and Ma Tak Road at the time specified below:
1. Lane Closure
The following road sections will be temporarily closed to all vehicular traffic:
a.
From 10am to 4pm daily between 26 January 2026 and 14 February 2026 (except Sundays and Public Holidays)
- The slow lane of Ma Sik Road eastbound from a point about 38 metres east of its junction with Wo Tai Street and Ma Tak Road to the same junction; and
- the slow lane of Ma Tak Road southbound from a point about 40 metres north of its junction with Ma Sik Road to the same junction.
b.
From 10am to 4pm daily between 16 February 2026 and 7 March 2026 (except Sundays and Public Holidays)
- The fast lane of Ma Sik Road eastbound from a point about 38 metres east of its junction with Wo Tai Street and Ma Tak Road to the same junction.
c.
From 10am to 4pm daily between 9 March 2026 and 28 March 2026 (except Sundays and Public Holidays)
- The fast lane of Ma Sik Road westbound from a point about 80 metres east of its junction with Wo Tai Street and Ma Tak Road to the same junction.
d.
From 10am to 4pm daily between 30 March 2026 and 18 April 2026 (except Sundays and Public Holidays)
- The slow lane of Ma Sik Road westbound from a point about 80 metres east of its junction with Wo Tai Street and Ma Tak Road to the same junction.
Appropriate traffic aids will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive in utmost care.