Members of the public are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Clear Water Bay Road from 10.00 am to 4.00 pm on 13 February 2026 and from 10.00 am to 1.00 pm on 16 February 2026:
A section of Clear Water Bay Road from a point about 150 meters north of its junction with Pak To Avenue to a point about 240 meters north of the same junction will be temporarily coverted from two-lane two-way traffic into one-lane two-way traffic.
The following bus stops and New Territories Green Minibus (GMB) stops will be temporarily relocated:
| Location of Bus Stops/ GMB Stops | Details | Affected Routes |
| Clear Water Bay Road northbound opposite to Sheung Yeung | Relocate southward for about 70 metres |
KMB Route No. 91 GMB Routes Nos. 16, 103 and 103M |
| Clear Water Bay Road southbound near Sheung Yeung | Relocate northward for about 20 metres |
Appropriate traffic signs will be erected on site to guide motorists. Notices will be put up to advise passengers of the temporary arrangements.