TRAFFIC ADVICE
Temporary Traffic Arrangement on Heung Yip Road, Wong Chuk Hang

        Motorists are advised that to facilitate drainage works, the section of right lane of Heung Yip Road eastbound outside Yally Industrial Building will be temporarily closed to all vehicular traffic from 7.00 am on 30 January 2026 to 7.00 pm on 26 February 2026.

        Appropriate traffic signs will be erected on-site to guide motorists.