Motorists are advised that to facilitate power supply works, the following temporary traffic arrangements on On Fuk Street, Fanling will continue to be implemented from 8.00 a.m. on 2 February 2026 to 6.00 p.m. on 28 February 2026:
The slow lane of On Fuk Street from a point about 10 metres south of its junction with Lok Tung Street to a point about 80 metres south of the same junction will be temporarily closed in phases to all vehicular traffic.
The overnight goods vehicle parking spaces on the eastern kerbside lane of On Fuk Street from a point about 40 metres south of its junction with Lok Tung Street to a point about 65 metres south of the same junction will be temporarily relocated to the eastern kerbside lane of On Chuen Street from a point about 70 metres south of its junction with On Kui Street to a point about 110 metres south of the same junction.
Appropriate traffic signs will be erected on site to guide motorists.