Motorists are advised that, to facilitate sewerage works, the following temporary traffic and transport arrangements will be implemented on Man Kam To Road from 10 a.m. on 2 February 2026 to 6 p.m. on 30 April 2026:
The slow lane of Man Kam To Road northbound from a point about 60 meters north of its junction with Sha Ling Road to a point about 135 meters north with the same junction will be temporarily closed from all vehicular traffic.
Appropriate traffic signs will continue to be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.