Traffic Advice
Extension of Temporary Traffic and Transport Arrangements on Tong Yan San Tsuen Road, Yuen Long


        Members of the public are advised that to facilitate road works, the following temporary traffic and transport arrangements will continue to be implemented on Tong Yan San Tsuen Road from 6.00 p.m. on 5 February 2026 to 6.00 pm on 6 August 2026:

(I)   Lane Conversion

       The section of Tong Yan San Tsuen Road from a point about 30 metres north of its junction with Tong Tai Road to a point about 40 metres south of the same junction will be temporarily converted from two-lane two-way traffic to one-lane two-way traffic.

(II)   Temporary Arrangements of GMB Stops

(i)    The GMB stop of GMB Route Nos. 31 and 31A on Tong Yan San Tsuen Road northbound near Tong Tai Road will be temporarily suspended;
(ii)   The GMB stop of GMB Route No. 31A on Tong Yan San Tsuen Road southbound near Tong Tai Road will be temporarily relocated for about 90 metres southward to a point about 30 metres south of the junction of Tong Yan San Tsuen Road southbound with Sha Tseng Road; and
(iii)  The GMB stop of GMB Route No. 31 (normal departure) on Tong Yan San Tsuen Road southbound near Tong Tai Road will be temporarily relocated for about 95 metres southward to a point about 30 metres south of the junction of Sha Tseng Road southbound with Tong Yan San Tsuen Road.

        Appropriate traffic signs have been erected to guide motorists. The GMB operator has displayed notices to advise passengers of the above arrangements.