Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented on Wan Po Road and Tseung Kwan O Tunnel Road on the following days:
|
Date |
Time |
Traffic Arrangement |
| 24 and 25 February 2026 | From 10.00 pm to 5.00 am of the following day daily |
|
Motorists are advised to drive with care and patience. Appropriate traffic signs will be erected on site to guide motorists.