Traffic Advice
Temporary Traffic Arrangement on the
Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road
Motorists are advised that the following temporary traffic arrangements will be implemented on the Hong Kong-Zhuhai-Macao Bridge ("HZMB") Hong Kong Link Road to facilitate the bridge construction works:
From 8.00 am on 2 March 2026 to 3.00 pm on 6 March 2026
• a section of right lane, middle lane and hard shoulder of HZMB Hong Kong Link Road (Hong Kong bound) from a point about 400 metres south of its junction with Shun Lui Road to a point about 950 metres south of the same junction will be temporarily closed. Vehicles heading to Hong Kong have to use the left lane.
Motorists are advised to drive with care and patience. Appropriate traffic signs will be provided at the road section concerned on site to guide motorists.