Motorists are advised that to facilitate the installation works of cable brackets, the following temporary traffic arrangements will be implemented at Shing Mun Tunnels on the following days:
|
Date |
Time |
Traffic Arrangement |
| 13, 20 and 27 March 2026 | From 12.30 am to 6.00 am daily |
One-tube-two-way operation will be implemented at the Sha Tin bound tunnel tube |
Motorists are advised to drive with care and patience. Appropriate traffic signs will be erected on site to guide motorists.