Motorists are advised that to facilitate construction works, three metered parking spaces (nos. 11030A, 11031B and 11032A) on Fei Fung Street westbound opposite to Lee Shing Building will be temporarily suspended from 10.00 am on 16 March 2026 to 6.00 pm on 30 June 2026.
At the same time, three metered parking spaces (nos. 11030A, 11031A and 11031B) will be temporarily provided on Ming Fung Street eastbound opposite to Wing Wah Building.
Appropriate traffic signs and road markings will be erected on site to guide motorists.