TRAFFIC ADVICE
Temporary Traffic and Transport Arrangements on Tsui Ping Road, Kwun Tong

         Motorists are advised that to facilitate drainage works, the following temporary traffic and transport arrangements will be implemented in Kwun Tong from 9.00 pm on 31 March 2026 to 5.30 am on 30 September 2026.

  1. Lane Closure

The following traffic lanes will be temporarily closed to all vehicular traffic:

  1. The traffic lane of Tsui Ping Road northbound from its junction with the unnamed access road leading to Tsui Nam House to a point about 50 metres south of the same junction; and

  2. The traffic lane of Tsui Ping Road northbound from its junction with the unnamed access road leading to Tsui Nam House to a point about 20 metres north of the same junction.
  1. Lane Conversion

The section of Tsui Ping Road of about 70 metres near Tsui Nam House will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic.

  1. Public Transport Arrangement

The GMB stop on Tsui Ping Road northbound near Tsui Nam House for Kowloon GMB Route No. 47 will be temporarily relocated about 35 metres southward.

        Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to observe the instruction and drive with utmost care. Notices will also be displayed by public transport operator to advise passengers of the above arrangements.