Temporary Traffic Arrangements on Po Ning Road and Sheung Ning Road, Tseung Kwan O

          Members of the public are advised that to facilitate the road resurfacing works, the following traffic lanes will be temporarily closed to all vehicular traffic on the dates listed below:

Date

Time

Closed Lane

29 March 2026

12:30 pm – 5:00 pm

The fast lane on Po Ning Road westbound from a point about 30 meters east of its junction with Sheung Ning Road to a point about 160 meters west of its junction with Sheung Ning Road.

12 April 2026

9.00 am – 5:00 pm

The slow lane on Sheung Ning Road northbound from a point about 100 meters north of its junction with Ming Shing Street to a point about 30 meters south of its junction with Po Ning Road.

19 April 2026

The fast lane on Sheung Ning Road southbound from its junction with Po Ning Road to a point about 30 meters north of its junction with Chung Wa Road.

26 April 2026

The slow lane on Sheung Ning Road southbound from a point about 20 meters south of its junction with Po Ning Road to a point about 25 meters north of its junction with Chung Wa Road.

          During the road closure, motorists can use the remaining traffic lane of the above road section.

          Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to drive with utmost care and patience.