Traffic Advice
Temporary Traffic and Transport Arrangements on Hung Tin Road, Yuen Long


        Members of the public are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Hung Tin Road from 10.00 p.m. to 5.30 a.m. of the following day daily on 11, 13, 18 and 20 May 2026:

(A)   Temporary Traffic Arrangements

(I)    Road Closure

The slip road leading from Yuen Long Highway eastbound to Hung Tin Road northbound will be temporarily closed to all vehicular traffic.

(II)   Traffic Diversion

(i)     Affected vehicles on Tuen Mun Road northbound heading for Hung Tin Road northbound will be diverted via Lam Tei Interchange, Castle Peak Road – Lam Tei eastbound and Castle Peak Road – Hung Shui Kiu eastbound; and
(ii)    Affected vehicles on Yuen Long Highway eastbound heading for Hung Tin Road northbound will be diverted via Tong Yan San Tsuen Interchange, Long Tin Road northbound, Shui Pin Wai Interchange, Long Tin Road southbound, Tong Yan San Tsuen Interchange and Yuen Long Highway westbound.

(B)   Temporary Transport Arrangements

LWB Route Nos. N30 (Yuen Long bound), E36A (Yuen Long bound), X36 (Kam Sheung Road bound) and A37 (Yuen Long bound) will be diverted via Tong Yan San Tsuen Interchange, Long Tin Road northbound, Shui Pin Wai Interchange, Castle Peak Road – Ping Shan westbound and Castle Peak Road – Hung Shui Kiu westbound before resuming their original routeings.

        Appropriate traffic signs will be erected to guide motorists. The bus company will put up notices to advise passengers of the above arrangements.