Motorists are advised that to facilitate cable duct laying works, the following temporary traffic arrangements will be implemented on Kwai Wing Road, Kwai Chung during the periods as specified below:
(A) From 10.00 am to 4.00 pm on Mondays to Saturdays (except Public Holidays) from 18 May 2026 to 20 July 2026
(I) Lane Closure
(B) From 8.00 am on 18 May 2026 to 6.00 pm on 20 July 2026
(I) Temporary Suspension of Metered Parking Spaces
Appropriate traffic signs will be erected on site to guide motorists.