Traffic Advice

Extension of Temporary Traffic Arrangements
on Yeung Uk Road, Tsuen Wan

        Motorists are advised that to facilitate drainage works, the following temporary traffic arrangements will continue to be implemented on Yeung Uk Road from 10.00 a.m. to 6.00 p.m. daily (except Public Holidays) from 1 June 2026 to 19 September 2026:-

Road Closure

    1. The slow lane of Yeung Uk Road eastbound from its junction with Tai Ho Road to a point about 40 metres east of the same junction will continue to be temporarily closed to all vehicular traffic ; and
    2. The middle lane of Yeung Uk Road eastbound from its junction with Tai Ho Road to a point about 70 metres east of the same junction will continue to be temporarily closed to all vehicular traffic.

Suspension of Parking Space

One rehabus parking space on Yeung Uk Road near Citywalk will continue to be temporarily suspended.

Appropriate traffic signs will be erected on site to guide motorists.