Motorists are advised that to facilitate road works, from 8.00 am to 6.00 am of the following day on 24, 31 May, 7 and 14 June 2026, the following temporary traffic arrangements will be implemented on Tsing Sha Highway:
Road Closure
The northbound carriageway of Tsing Sha Highway between the slip road leading from Castle Peak Road – Kwai Chung and Eagle's Nest Tunnel will be temporarily closed to all vehicular traffics.
Traffic Diversion
Vehicles on Ching Cheung Road eastbound and Tsing Sha Highway heading to Sha Tin will be diverted via Ching Cheung Road eastbound and Tai Po Road.
Motorists are advised to drive with care and patience. Appropriate traffic signs will be provided on site to guide motorists.